Project 2: Sale and Dismantling of a Medium-Frequency Induction Furnace System (2x Crucible Furnaces)
For the second project, Patar once again relied on the expertise of TCT Tesic. The medium-frequency induction furnace system, which included two crucible furnaces and came from a foundry in southern Germany, was sold in October 2024.
TCT Tesic was already aware of Patar’s need for such a system and was able to offer a perfectly matched solution. After technical documents, photos, and drawings were exchanged, the deal was finalized without delay. The dismantling took place in January 2025 and lasted approximately three weeks.
As with the DISA project, Patar sent its own team of technicians, who worked under the on-site supervision of TCT Tesic. The system was professionally dismantled, packed, and prepared for collection. TCT Tesic also managed the entire export process, ensuring a smooth and professional execution
Conclusion: Tailored Solutions, Global Reach
These two successful projects with Patar highlight the core strengths of TCT Tesic:
 	-  	Years of market experience 
-  	Reliable project coordination 
-  	Strong international network 
-  	Comprehensive support – from initial contact to export 
TCT Tesic continues to serve as a dependable partner for clients worldwide—whether for the sale, dismantling of complex foundry systems, or complete logistics and export management across borders.
Our strength lies in the combination of technical know-how, market insight, and a reliable global network. These projects with Patar are great examples of how efficiently international cooperation can work, emphasizes Darko Tesic, Managing Director of TCT Tesic.